Toilet renovation: at Which to Begin

17

The bathroom is a room with special conditions: high humidity, humidity differences. That is why making fixes in the restroom, you need to definitely plan the whole operating process, to consider the sequence of measures to be performed. Within the following article, you will learn where to begin the repair in the bathroom and what types of work should be performed with your own hands. Step-by-step instructions for toilet repair

Phase 1: Establishing a plan and selecting a design solution.

Repair in the toilet can be of two types:

  • Unplanned, spontaneous, originating from the can of unforeseen conditions. By way of instance, in case of a pipe burst, flooding by neighbors.
  • Planned, which is either capital or cosmetic. It requires preparation, serious fiscal investment and time.

Begin repairs at the toilet is to find out the plan, inside. Think through the last detail, what will be the room, select a color. Pastel colours are traditional, as well as a blend of blue and blue, or peach with beige.

Begin repairs at the toilet is to find out the plan, interior layout. Consider detail, what will be the room, select a colour. Pastel colours are thought to be traditional, in addition to a blend of colours.

The next point is the option of facing substance. Generally, finishing in the bathroom is done with vinyl, porcelain tiles, mosaic, plastic panels. Examine the pipes, whether it has to be replaced. If necessary, select the right choice. Proceed to the measuring function: quantify all sides, calculate the area of the area. Based on these information, we mark the location of the plumbing fittings.

Step 2: the choice of sanitary fittings and material for completing.

It’s necessary to realize that the purchase price of sanitary ware simplifies the preparation stage, rather than vice versa. This means that first we develop a design project, create a plan, and then go to the shop. The following thing – you should specify how big your favorite plumbing fixtures and check the program, whether it matches.

It is crucial to see that the purchase of plumbing fittings is preceded by a preparation period, rather than vice versa. This means that first we develop a design project, make a plan, then go to the shop. Another one

As vsyakuhnya.ru for stuff for finishing, it is preferable to purchase them instantly for the whole repair cycle, in order that you will not be diverted if something was missing. Remember about preparing the vital tools.

Step 3: dismantling plumbing and tiling.

Once all the preliminary work has been done, move on to the beginning of the task process:

  • Eliminate the sink and bathtub from the area, even though they won’t be replaced with fresh ones. In this way, you are able to keep them intact and clean.
  • Remove the old tile, cleaning after it all surfaces: walls, ceiling, floor.
  • Remove paint from the walls, even if they were formerly painted, as the adhesive solution or a fresh layer of paint will not adhere to the surface.

Step 4: Cost of communications: pipes, electric wiring.

Very often in an old home, you should carefully inspect and replace not only the pipes that are in the bathroom itself, but in addition the main riser, and at times the interfloor pipes. Why is it worth doing so? Old pipes anytime may give a leak, then the new repair will be emptied, it is going to call for additional investment to eliminate defects.